RES project studies

Supporting RES Project Studies

  • Environmentalist Services for the Special Ecological Evaluation of the project Installation of a Photovoltaic Station 100KW at the location “Chioniasa”, PC Pedini, D.E. Bizaniou. / GEORGE KATSOS LIMITED LIABILITY COMPANY
  • Environmentalist Services for the Special Ecological Evaluation of the project Installation of a Photovoltaic Station 500kWp in the location “Marathaki”, in T.K. Agios Nikolaos, of the Municipality of Aktio – Vonitsa in the Prefecture of Etoloakarnania, Region of Western Greece. / BOURSINOS P. CHALIKIAS N. OE
  • Preparation, submission & monitoring of the modification of AEPO according to the new design of the project, as well as the preparation, submission & monitoring of the accompanying studies of the Wind Power Plant “Eastern Askio – Magoula”, Kozani. EASTERN ASKIO – MAGOULA SOLE SHAREHOLDER ENERGY ANONYMOUS ETAIPEIA
  • Preparation of the Environmental Impact Study and the necessary contents of the wind farms at the “Trygonas” sites of D. Igoumenitsa, P.E. Thesprotia, and “Krania” of D. Parga, of P.E. Preveza, in the Region of Epirus / GR WIND PARK PREVEZA 1 Ε.Ε.
  • Preparation of the Environmental Impact Study and the necessary contents of this wind farm at the location “Magoula” of D. Eordaia of P.E. Kozani, in the Region of Western Macedonia / GR KOZANI WIND PARK 1 Ε.Ε.
  • Preparation of the Environmental Impact Study and the necessary contents of the wind farms at the locations “Koukos Petra” and “Analipsi” of the Municipality of Florina. Florina, in the Region of Western Macedonia. / GR FLORINA WIND PARK 10 Ε.Ε.
  • Elaboration of the Environmental Impact Study and the necessary contents of this wind farm at the location “Vigla” of D. V. Kynouria of P.E. Arcadia, in the Peloponnese Region. / ARGOS AEOLOS SA
  • Preparation of the Environmental Impact Study and the necessary contents of this tvn wind farms at the “Korfi” sites of D. Aliartos of P.E. Boeotia and “Daniel” of D. Delphi, P.E. Fokida, in the Region of Central Greece / AETOS WIND PARK SA
  • Preparation of a study for the modification of forest road and phytotechnical study for a Wind Power Plant with a licensed capacity of 12.0 MW, at the location “Koukouli-Grivas” of P.E. Kozani. / VOLTERRA HOUSE SOLE SHAREHOLDER SOCIETE ANONYME
  • Elaboration of Photo Interpretation for the characterization of areas in three (3) plots located respectively in the areas of Elassona, Evangelismos and Kefalovrysso, Municipality of Elassona, P.E. Of Larissa. / AirEnergy Α.Ε .Ε.
  • Elaboration of Photo Interpretation for the characterization of areas in three (3) plots located respectively in the areas of Elassona, Evangelismos and Kefalovrysso, Municipality of Elassona, P.E. Of Larissa. / AirEnergy Α.Ε .Ε.
  • Preparation, submission and monitoring of the Dossier for Inclusion in Standard Environmental Commitments (EPP) of the special forestry project in the area of ​​Nyfiou D.E. Argostoli D. Argostoli, according to no. Οικ.111469 / 8-7-2020 Π.Π.Χ. of the Director of Forests / PPC Renewables SA
  • Photo-interpreting service of the evolution of reforestation projects in the wind farms “Kasidiaris 1” & “Kasidiaris II” of P.E. Ioannina, in the Region of Epirus and “Western Askio” & “Eastern Askio Maestros” of P.E. Kozani, in the Western Region / ELLAKTOR SA
  • Preparation of a special hydraulic – hydrological study for the A / P “Xerakias” Kefalonia / PPC Renewables SA
  • Monitoring service for the restoration works of the declared reforested areas in the Wind Park “Kasidiaris 1” / ELLAKTOR SA
  • Preparation of STUDY OF ROAD CONSTRUCTION & SQUARES A / C WIND PARK POWER 2.4 MW AT “LIVAS” ELATI AND ALYKON MUNICIPALITY OF ZAKYNTHOS, PE ZAKYNTHOS and its PPD. / WEST WIND OF ZAKYNTHOS EU
  • Preparation of a Study for the Execution of special forestry projects on areas under the jurisdiction of the Alexandroupolis Forest Service – Road improvement in the area of Kallithea Melissa. / ARINOMARIO PROF. ΗΛΙΑΣ
  • Forester Services for the Environmental Impact Study of MOUE “Potamias”, power 1.64MWe, Municipality of Grevena, P.E. Of Grevena and the Environmental Impact Study of MYE “Paleochori”, capacity 2.64MWe, Municipality of Grevena, P.E. Grevena. / ΚΟΚΚΙΝΟΣ ΑΤΕΕ ΠΙΝΔΟΣ ΑΕ ΑΠΕ ΟΕ
  • Preparation of an ENVIRONMENTAL PROJECT FOR THE RENEWAL OF THE PROJECT: WIND PARK OF POWER 20 MW
  • Preparation of an ENVIRONMENT FOR THE RENEWAL OF THE PROJECT: WIND PARK OF 20 MW AND ITS PROJECTS AT THE “ASPROVOUNI” POSITION OF THE MUNICIPALITY
  • Preparation of an Environmental Study for the Modification of the AEPO of the project Wind Power Station (ASPIE) with a capacity of 34 MW, and accompanying projects at the location “Eastern Askio Maestros” in the Municipality of Voio. Kozani / A.P. EASTERN ASKIO MAESTROS SA
  • Preparation of the Environmental Study for the Modification of the AEPO of the project Wind Power Station (ASPIE) with a capacity of 38 MW, and accompanying projects at the location “Western Askio”, in D. Voio P.E. Kozani / WEST ASKIO SA
  • Preparation of TEPEM required for the INSTALLATION PROCESS OF URBAN SOLID WASTE OF THE REGION OF EPIRUS, in the Municipality of Polygyros of the Municipality of Dodoni of the Municipality of Dodoni, P.E.E.E.
  • Preparation of a Special Ecological Assessment Study (E.O.A) for a Small Hydroelectric Power Plant with a capacity of 5 MW of the Kerkini HPP SA. at Roufrakti in the community of Lithotopou, P.E. Serres. / ΥΚ ΚΕΡΚΙΝΗΣ Α.Ε.
  • Modification of Environmental Impact Studies for the Wind Parks: KASIDIARIS 1 power 50 MW, in the Municipalities of Zitsa and Pogoni and KASIDIARIS 2 power 50 MW, in the Municipality of Pogoni / ELTEX ANEMOS SA
  • Preparation of Environmental Impact Study (EIA) of the project: Wind Park with a capacity of 30 MW at the location “Chalkodonio” of the Municipality of Riga Fereou P.E. Magnesia, Decentralized Administration of Thessaly & Central Greece. / AirEnergy SA
  • Preparation of a study of Special Ecological Assessment (EOA) of the Wind Farm of EL.TECH ANEMOS SA, at the location “Agrachladia – Pr. Elias – Petra Haidos – Diavolorachi – Pr. Elias “, with the name” KASIDIARIS 2 “. / EL.TECH ANEMOS SA
  • Provision of consulting services for the elaboration of the Environmental Impact Studies of the projects. / AirEnergy SA
  • Elaboration of the Environmental Study of the project “WIND PARK OF POWER 10.3 MW AT THE LOCATION” LACTIES – WAR – SOROS “OF THE MUNICIPALITY OF KEFALONIA IN THE REGIONAL UNIT OF KEFEREON
  • Environmental Impact Study of the project Wind Farm with a capacity of 39 MW at the location “Kastro – Lykovouni” of the Municipality of Thebes & the Municipality of Tanagra P.E. Boeotia of the Decentralized Administration of Thessaly & Central Greece / AirEnergy SA
  • Environmental Impact Study of the project 15 MW Wind Farm at the location “Aerorachi” of the Municipality of Amyntaio P.E. Florina of the Decentralized Administration of Epirus and Western Macedonia ”/ AEROLRAHI AEOLIC PARK SA
  • Participation in the elaboration of the Environmental Impact Design of the Project KASIDIARIS 1 wind farm with a capacity of 50 MW at the location “KRANIES-KARAVAMIA-ELATOS” of the Municipalities of Molossi, Euremenia, Ano Kalama and the Community of Lavdan, Prefecture of Ioannina. / HELLENIC TECHNODOMIKI ANEMOS SA
  • Participation in the elaboration of the Environmental Impact Preliminary Study of the Project KASIDIARIS 1 wind farm of 50 MW in the location “KRANIES-KARAVAMIA-ELATOS” of the Municipalities of Molossi, Evrymenon, Ano Kalama and the Community of Lavdano, Nomani. / HELLENIC TECHNODOMIKI SA
  • Provision of forester services for the elaboration, licensing and implementation of the reforestation study of part of the reforestable areas, 150 acres, of the public forests of D.E. Perama of the Municipality of Ioannina for the needs of the Wind Park “Kasidiaris I”. /ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Reforestation study and Phytotechnical restoration study of the vegetation for the installation of the Wind Park “KILLED – DEEP CORNER” in D.E. Desfina, Municipality of Delphi P.E. Φωκίδας. / AirEnergy SA
  • Reforestation study and study of Phytotechnical restoration of vegetation for the installation of Wind Farms “PYRAMIDA-TURTLE” & “KOURMOUTSI-KARDARA” in D.E. Desfina, Municipality of Delphi P.E. Fokida./ AirEnergy SA
  • Compilation of Reforestation study at the location “PERNARI- IKONISMATAKI” & “PALAMARI” area of Kourouklaton, Kefalonia, area of the same area as the one for the expansion of the wind farm from 27.2 MW to 34.5 MW, at the mountain “Ag. Strong »D. Kefallonia. / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Reforestation at the location “PERNARI – IKONISMATAKI” area of Kourouklaton D.E. Argostoli, Municipality of Kefalonia, area of the same area as that for the expansion of the Wind Farm from 13.6MW to 20 MW, at the location “Monolati – Xerolimpa” Municipality of Kefalonia, P.E. Of Kefallinia. / ELTEX ANEMOS SA
  • Phytotechnical study Rehabilitation of the forest vegetation of the non-functional disturbed areas of the modified road construction of the Wind Farm “East Askio Maestros”. / ELTEX ANEMOS SA
  • Phytotechnical study Rehabilitation of the forest vegetation of the non-functional disturbed areas of the modified road construction of the Wind Farm “West Askio”. / ELTEX ANEMOS SA
  • Preparation of REFORMATION STUDY of 39,814.62 sq.m. in the area AN. ΟΙΚ. SMIGADAS, D. ARRIANON P.E. RODOPIS for the needs of the WIND PARK at the location “ORFEAS – EPTADENDROS” / ELTEX ANEMOS SA
  • Phytotechnical study for the restoration of declared reforestable areas at the sites “Kranies, Karavamia, Elatos, Pr. Elias »Municipality of Pogoni & Municipality of Zitsa, Ioannina Prefecture. / ELTEX ANEMOS SA
  • Modification of Reforestation Study for the needs of Wind Farms “Pyramid-Turtle” & “Kourmoutsi-Kardara” of VECTOR AEOLIKI DESFINAS SA & Wind Farm “Skotomeni-Vathia Gonia” of VECTOR AEOLIKI SOUTH SOUTH DESFINAS SA / AirEnergy Α.Ε .Ε.
  • Modified Phytotechnical Restoration Study of Wind Farms “Pyramid-Turtle” & “Kourmoutsi-Kardara” by VECTOR AEOLIKI DESFINAS SA & Wind Farm “Killed-Deep Corner” VECTOR AEOLIKI SOUTH SOUTH DESFINAS SA / AirEnergy Α.Ε .Ε.
  • Preparation of the Phytotechnical study for the Restoration of the forest vegetation of the non-functional disturbed areas of ASPIE in the place “Mellia” of D.K. Siatista of the Municipality of Voio Kozani / VENTAVEL ENERGY SA
  • Monitoring service for the restoration works of the declared reforested areas in the Wind Park “Kasidiaris 1” / ELLAKTOR SA
  • Preparation of a Phytotechnical study for the restoration of the forest vegetation of the KASIDIARIS 1 Wind Farm & the High Voltage Line, at the location “Kranies-Karavamia-Elatos” of Mount Kasidiaris in the Municipalities of Pogoni & Zitsa, P.E. Ioannina / EL.TECH. ΑΝΕΜΟΣ Α.Ε.
  • Preparation of the Phytotechnical Study for the Restoration of the forest vegetation of the disturbed and non-functional areas of the Wind Park at the location “Orpheas – Eptadendros” of the Municipalities of Arriana & Alexandroupolis of the Peripheral Units of Rodopi & Evros / EL.TECH. ΑΝΕΜΟΣ Α.Ε.
  • Elaboration of a Phytotechnical Study for the Rehabilitation of the forest vegetation of the non-functional disturbed areas of the Wind Park at the location “West Askio” of the Municipality of Voi of P.E. Kozani / DYTIKO ASKIO SA
  • Phytotechnical study for the restoration of the vegetation of the disturbed areas of the municipal waste treatment plant of the Epirus Region in the Polygyros Municipality. Dodonis / TERNA Energy ATEVE
  • Preparation of the Phytotechnical Study for the Rehabilitation of the forest vegetation of the disturbed and non-functional areas of the Wind Farm “East Askio Maestros” in T.K. Ερατυρας της Δ.Ε. Askiou of the Municipality of Voi of P.E. Kozani./A.P. EASTERN ASKIO MAESTROS SA
  • Preparation of the Phytotechnical Study for the Restoration of the forest vegetation of the disturbed and non-functional areas of the KASIDIARIS II Wind Farm, at the location “Agrachladia – Profitis Ilias – Petra Haidos – Diavolorrachi – Tourla – Profitis Ilias” of the Municipality. / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Phytotechnical study for the restoration-reforestation of the natural environment from the interventions for the installation of the Wind Farm at the location “Gropes – Rachi Gioni” Municipality of Monemvasia P.E. Laconia. / AEOLIKI MOLAON LAKONIA SA
  • Study of phytotechnical restoration of the forest vegetation of the disturbed and non-functional areas for the Wind Park at the location “Kasidiaris I”. / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Compilation of a Phytotechnical Study for the Rehabilitation of the forest vegetation of the disturbed and non-functional areas of the 12.8MW Wind Power Plant at the site of Profitis Ilias D.E. Alexandroupolis Municipality of Alexandroupolis P.E. Evros.
  • Preparation of a Phytotechnical study for the Rehabilitation of the forest vegetation of the non-functional disturbed expansion areas of the 34.5 MW Wind Farm at the location “Agia Dynati” in the Municipal Unit of Pylareon, Municipality of Kefalonia, Regional Unit of Kefallinia. / ELTEX ANEMOS SA
  • Preparation of a Phytotechnical study for the Rehabilitation of the forest vegetation of the non-functional disturbed expansion areas of the 20 MW Wind Farm in the location “Monolati – Xerolimpa” of the Municipality of Kefalonia, Regional Unit of Kefallinia. / ELTEX ANEMOS SA
  • Phytotechnical study for the restoration of the forest vegetation of the non-functional disturbed areas of the 20.7 MW Wind Farm on Mount Asprovouni of the Municipality of Trizinia. / ELTEX ANEMOS SA
  • Special Phytotechnical Study for the Rehabilitation of the forest vegetation of the non-functional disturbed areas of the 39 MW Wind Farm in the location “Mount Lyrkeio” of the Municipality of Tripoli of PE. Of Arcadia and the Municipality of Argos-Mycenae of P.E. Of Argolida. / ELTEX ANEMOS SA
  • Phytotechnical Study for the Restoration of the vegetation of the disturbed areas of the project WIND PARK OF POWER 4MW AT THE “KOKKINO LITHARI” LOCATION, PC ΤΡΑΓΑΝΑΣ ΔΗΜΟΥ ΛΟΚΡΩΝ Π.Ε. ΦΘΙΩΤΙΔΑΣ. / AirEnergy SA
  • Study for the Restoration of the forest vegetation of the non-functional disturbed areas of the 2.4 MW Wind Farm at the “MOROU” site of Kipouraion, Municipality of Kefalonia, Peripheral Unit of Kefallinia, Ionian Islands Region. / IONIAN WIND ENERGY EU
  • Reforestation study at the location “Pernari – Ikonismataki” in the area of Kourouklaton D.E. Argostoli, Municipality of Kefalonia Kefallinia, of the same area (17,017.19 sq.m.) with the one in which the intervention for the construction of the Wind Farm was approved. / IONIAN WIND ENERGY EU
  • Phytotechnical Study for the Restoration of the vegetation of the disturbed areas of the 27 MW Wind Farm in the location “Loutsa” of the Municipality of Lokron, Peripheral Unit of Fthiotida, Decentralized Administration of Thessaly – Central Greece. / AirEnergy SA
  • Preparation of a study for the restoration of the surrounding area and the vegetation of the project Extension in operation of a Wind Farm from 22.95 MW to 39.1 MW, at the location “Magoula Kazakou – Diplon”, Municipality of Alexandroupolis, Regional Unit of Evros. / ELTEX ANEMOS SA
  • Elaboration of the Phytotechnical Study for the Restoration of the vegetation of the disturbed areas of the project “WIND PARK OF POWER 39 MW AT THE LOCATION” KASTRO – LYKOVOUNI “OF THE MUNICIPALITY OF THIVAIA AND THE MUNICIPALITY OF TANAFROE VE. / AirEnergy SA
  • Phytotechnical Study for the Restoration of the vegetation of the slopes of the Access Road of the 20 MW Wind Farm on Mount Asprovouni of the Municipality of Trizinia. / ELTEX ANEMOS SA
  • Study for the Restoration of the Environment and the Vegetation of the disturbed areas of the project Wind Farm Power 22.95 MW at the Site “Magoula Kazakou – Diplon”. / ELTEX ANEMOS SA
  • Compilation of an Environmental Rehabilitation study for the MIXIS project of Smixiotiko. / ELTEX ANEMOS SA
  • Vegetation Restoration Study of the disturbed areas of the project “15 MW Wind Power Park at the location“ Aerorachi ”of the Municipality of Amyntaio P.E. Florina of the Decentralized Administration of Epirus and Western Macedonia “. / AIR FLOOR PARK SA
  • Preparation of a Phytotechnical study for the Restoration of the Vegetation of the disturbed areas of the project WIND ELECTRICITY PRODUCTION STATION (ASPIE) of power 16.1 MW at the location “LAMPOUSA – SPASMERI” / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Study for the restoration of the surrounding area of the project: High Voltage Transmission Line and Medium Voltage Lifting Substation for the interconnection of the wind farm at Magoula Kazakou with the Nea Santa HPP. / ELTEX ANEMOS SA
  • Preparation of a special hydraulic – hydrological study for the A / P “Xerakias” of Kefalonia. / PPC Renewables SA
  • Provision of forester services for the issuance of Information Acts for the 1. 28 MW Wind Farm in the location “KOURMOUTSI – KARDARA” Municipality of Delphi, 2. Wind Farm of 25.3 MW in the location “PYRAMIDA – TURTLE” Municipality of Delphi and 3. Park at the location “KILLED – DEEP CORNER”. / AirEnergy SA
  • Hydraulic road construction study for the Wind Park with a power of 34.5 MW, at the location “Agia Dynati” in the Municipal Unit of Pylareon, Municipality of Kefalonia, Peripheral Unit of Kefallinia, Ionian Islands Region. / ELTEX ANEMOS SA
  • Study of forestry works in the area of Simotaton, PC Vlachaton Eikosimias – D.E. Livathos, Municipality of Kefalonia Kefallinia of the Ionian Islands Region. / ELTEX ANEMOS SA
  • Study of Forestry Works for the improvement of the accessibility of the forest road network in the Public forest of Voio in the sections 10,11,12,15,17,18, 20 & 46 / ELTEX ANEMOS SA
  • Study of forestry projects for improving the walkability of part of the forest road network of the public forest complex Vlastis – Commerce, according to no. prot. 33399 / 05-03-2019 Act of Informative Character of the Kozani Forest Service. / ELTEX ANEMOS SA
  • Preparation of a Study of Forestry Works according to the relevant Information Act of the Tsotyli Forest Service for ASPIE in the position “Mellia” of D.K. Siatistas D. Voiou P.E. Kozani. / VENTAVEL ENERGY SA
  • Capture of existing roads and technical problems bypassing the settlement of Aetos for access to the Wind Farm at the location “Aerorrachi” of the Municipality of Amyntaio P.E. Florina. / AirEnergy AEE
  • Preparation of a road construction study for the improvement of an existing forest road and opening of a new forest road of category D at the location of “Kirkis” D. Alexandroupolis P.E. Evros for the needs of the Wind Park “Orpheus – Eptadendros” P.E. Rodopi & Evros. / ELTEX ANEMOS SA
  • Preparation of a Road Construction Study of the project: 33MW wind farm at the location “Erimia” of the Municipal Unit of Malesini, Municipality of Lokron, Fthiotida Prefecture. / AirEnergy Α.Ε .Ε.
  • Preparation of a study for the improvement of the passability of the forest road network in the area of responsibility of the Forest Service of Ioannina in T.K. Aetopetra, Despotikou, Ekklissochoriou & Vassilopoulos D. Zitsas, P.E. Ioannina And Supporting works of a forester for licensing the project. / ELTEX ANEMOS SA
  • Preparation of a forest study to improve the passability of the Forest Road Network of the Public Forests of Pentalofos – Dilofos of the Public Forest of Voio, D.E. Pentalofou, Municipality of Voio, P.E. Kozani of the Region of Western Macedonia / Α.Π. EASTERN ASKIO MAESTROS SA
  • Preparation of the study for the improvement of the passability of the forest road network in Municipal forests in T.K. Delvinaki & Peristeri of D.E. Delvinakiou and in T.K. Lavdanis & Dimokoriou of D.E. Lavdanis of D. Pogonios, P.E. Ioannina Epirus Region / ELTEX ANEMOS SA
  • Modification of the road construction study of the project: Wind Farm with a capacity of 38.00 MW with its accompanying projects (Road Construction – Interconnection) at the location “West Askio” PC Εράτυρας, Δ.Ε. Askiou, of the Municipality of Voio, P.E. Kozani, in the Region of Western Macedonia. / WEST ASKIO ENERGIAKI SA
  • Modification of the road construction study of the project: Wind Farm with a capacity of 34.00 MW with its accompanying projects (Road Construction – Interconnection) at the location “East Askio Maestro” PC Εράτυρας, Δ.Ε. Askiou, of the Municipality of Voio, P.E. Kozani, in the Region of Western Macedonia. / Α.Π. EASTERN ASKIO MAESTROS SA
  • Modification of the Road Construction Study of the project: WIND PARK “KASIDIARIS I” POWER 50MW AT THE LOCATION “KRANIES – KARAVAMIA – ELATOS” of the Municipalities of Pogoni and Zitsa P.E. Ioannina Region of Epirus. / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Preparation of a road construction study for the Wind Farm at the “Xironomi” site of the Municipality of Tanagra, P.E. Boeotia of the Decentralized Administration of Thessaly & Central Greece. / AirEnergy SA
  • Preparation of a Road Improvement Study for Substation 30-20 / 150KV AP KASIDIARI 1. / EL.TECH. ΑΝΕΜΟΣ Α.Ε.
  • Preparation of a Study for the Application of Road Construction of a Wind Power Plant “Kastro-Lykovouni”, Power 42.9 MW Prefecture of Boeotia. / VOLTERRA LYKOVOUNI SOLE SHAREHOLDER ENERGY PRODUCTION AND TRADING SOCIETE ANONYME
  • Control of the forest road study of the interconnection projects of the Wind Parks with the network. / ΕΛ.ΤΕΧ. ΑΝΕΜΟΣ Α.Ε.
  • Preparation of a final Road Construction Study with the necessary modifications according to the Vestas V100 specifications and a study for the improvement of an existing road, a 42.9 MW Wind Power Plant, at the “Kastro-Lykovouni” site of the Regional Unit of Viotia. / VOLTERRA SA
  • Preparation of a Road Construction Study of the project: 2.4 MW Wind Farm in the location “Aetos” of the Municipality of Tanagra, P.E. Boeotia, Decentralized Administration of Thessaly & St. Of Greece. / AirEnergy SA ”
  • Compilation of a Road Construction Study & wind turbine squares of 12.8MW Wind Power at Profitis Ilias D.E. Alexandroupolis Municipality of Alexandroupolis P.E. Evros. / ENECO Μ.Ε.Π.Ε.
  • Elaboration of a study for Road Construction & Wind Turbine Squares with a wind power of 32 MW at the location “Orpheas – Eptadendros” Municipalities of Arriana & Alexandroupolis Peripheral Units of Rodopi & Evros. / ELTEX ANEMOS SA
  • Preparation of a Road Masonry Study for a 30 MW Wind Farm at the “Chalkodonio” site of the Municipality of Riga Fereou P.E. Magnesia, Decentralized Administration of Thessaly & Central Greece. / AirEnergy SA
  • Modification of the Improvement Study and new construction of a road to the Wind Park “Koukouli-Grivas” 12 MW in the Municipality of Voio P.E. Kozani D.K. Siatista. / AirEnergy SA
  • Road construction study of a 42.9 MW Wind Farm in the location “Kastro – Lykovouni” of the Municipality of Thebes & the Municipality of Tanagra P.E. Boeotia of the Decentralized Administration of Thessaly and Central Greece. / AirEnergy SA
  • Elaboration of a Road Construction Study & wind turbine squares with a wind power of 28.8MW at the location “Kedros-Chondri Rachi” D.E. Kireos Municipality of Mantoudi – Limni – Agia Anna P.E. Evia Region of Central Greece. / KANDILIOU AEOLIKI SA
  • Elaboration of a study for the maintenance of an existing forest road from Aesimi to the location of “Magoula Kazakou”, D.E. Alexandroupolis, Municipality of Alexandroupolis, PE of Evros. / ELTEX ANEMOS SA
  • Preparation of studies of internal roads project WIND FARMS “PYRAMID-TURTLE” POWER 25,3 MW, “KOURMOUTSI -KARDARA” POWER 28 MW AND “Killed – DEEP CORNER” 54 MW POWER IN THE MUNICIPALITY DESFINAS DELPHI, REGIONAL UNITY FOKIDAS. / AirEnergy SA
  • Preparation of final road construction studies for the wind farm at “GERAMPI”. (Compilation of a final study of external road construction and a final study of internal road construction). / BUSINESS ENERGY SOCIETE ANONYME
  • Preparation of the Road Construction Study of the project “WIND PARK OF POWER 10.3 MW AT THE LOCATION” LACHTIES – POLEMI – SOROS “OF THE MUNICIPALITY OF KEFALONIA IN THE REGIONAL UNIT OF KEFALION. / AirEnergy SA
  • Road Construction Study of a 2.4 MW Wind Farm at Mount “KAKAVOULI” Municipality of Zakynthos, Peripheral Unit of Zakynthos, Ionian Islands Region. / WEST WIND OF ZAKYNTHOS EU
  • Road Construction Study of a 2.4 MW Wind Farm at the “MOROU” KIPOURAION site, Municipality of Kefalonia, Peripheral Unit of Kefallinia, Ionian Islands Region. / IONIAN WIND ENERGY EU
  • Study for the Opening of New Roads of a 27 MW Wind Farm in the location “Loutsa” of the Municipality of Lokron, Regional Unit of Fthiotida, Decentralized Administration of Thessaly – Central Greece. / AirEnergy SA
  • Syntax of the following road studies of wind projects PARKS “PYRAMID-bullion” POWER 25,3 MW, “KOURMOUTSI -KARDARA” POWER 28 MW AND “Killed – VATHIA ANGLE” POWER 54 MW IN THE DESFINAS DIMOU DELPHI, REGIONAL UNIT FOKIDAS. / AirEnergy SA
  • Preparation of an internal road construction study for the expansion of the 20MW wind farm, at the location “MONOLATI-XEROLIMPA”, Municipality of Kefalonia, Regional Unit of Kefallinia, Ionian Islands Region. / ELTEX ANEMOS SA
  • Preparation of an internal road construction study for the extension of a wind farm in operation from 27.25 MW to 34.5 MW, at the location “Agia Dynati” in the Municipal Unit of Pylareon, Municipality of Kefalonia, Peripheral Unit of Kefallinia, Ionian Islands Region. / ELTEX ANEMOS SA
  • Study of internal road construction for the expansion of a wind farm in operation from 22.95 MW to 39.1 MW, at the location “Magoula Kazakou – Diplon”, Municipality of Alexandroupolis, Evros Regional Unit. / ELTEX ANEMOS SA
  • Provision of forester services for the participation in the process of approval and intervention permit of the forest road construction of the projects KASIDIARIS 1 wind farm with a capacity of 50 MW at “KRANIES-KARAVAMIA-ELATOS” and KASIDIARIS 2 wind farm with a capacity of 50 MW at AGRA HAIDOS – DIAVOLORRACHI – TOURLA – PROFITIS ILIAS “. / ELTEX ANEMOS SA
  • Road Construction Study of the 15 MW Wind Power Park at the “Aerorachi” location of the Municipality of Amyntaio P.E. Florina of the Decentralized Administration of Epirus and Western Macedonia “. / AIR FLOOR PARK SA
  • Preliminary design of access roads and internal road construction for the needs of the Kokkinitsa Wind Farm with a power of 17.5MW. / VENERGIA ENERGY SA
  • PREPARATION OF FOREST ROAD STUDY OF THE PROJECT WIND PARK “OROLOGI – BLACK STONE” ON MOUNT VERMIO. / Electricity company SA EL.TECH. ΑΝΕΜΟΣ Α.Ε.
  • Update of pre-design of forest road construction (new access road, new internal road construction and improvement of existing road construction) for the access to the installation site of the wind farm and the road interconnection of the wind turbines between them. / ENORA SA
  • Study for the opening of forest roads for the service of a wind farm in D.D. Koukouliou (Municipality of Fanari, Prefecture of Preveza). / AKRIS ENERGY LTD
  • Preliminary design of forest road for the access to the installation site of the wind farm for the interconnection of wind turbines in the area “Mountains of Kourenton” of the Municipalities of Molossi & Dodoni of the Prefecture of Ioannina. / P. Ladakakos and Co. EE (EU ENORIA)
  • Design and photo interpretation for the submission of a request for a Deed of characterization of the project: Wind Farm at the location “Desert” of the Municipal Unit of Malesini, Municipality of Lokron, Fthiotida Prefecture. / AirEnergy Α.Ε .Ε.
  • Provision of Forester services for the forest areas that fall within the limits of the topographic survey study for a 106 MW licensed Wind Power Plant, at the “Flower” location of the Regional Unit of Evros, Municipal Unit of Samothrace. / Spyridon Ramantzas, Agr. Landscape engineer
  • Cartographic mapping in Scale 1: 2000 of the new areas required based on the latest road construction studies for the Wind Parks at the locations “KOURMOUTSI – KARDARA”, “PYRAMID – TURTLE”, “SKOTOMENOI” and “BATH” Desfina, Municipality of Delphi. / AirEnergy SA
  • Provision of Forester services for the issuance of Designation Acts for the project sites: 29.1 MW Wind Farm at “Pyrgari – Gortzi”, 33 MW Wind Farm at “Xironomi” and 3.6 MW Wind Farm at ” Lakko Boukoura “. / AirEnergy SA
  • Provision of Forester services for the issuance of a deed of characterization of the project “WIND PARK OF POWER 2.4 MW AT THE” AETOS “LOCATION OF TANAGRA MUNICIPALITY – P.E. VIOTIA DECENTRALIZED ADMINISTRATION OF THESSALY & ST. GREECE “. / AirEnergy Α.Ε.Ε.
  • Provision of Forester services for the issuance of a deed of characterization of the project “WIND PARK OF POWER 39 MW AT THE LOCATION” KASTRO – LYKOVOUNI “OF THE MUNICIPALITY OF THIVAIA AND MUNICIPALITY OF TANAGRAS, REGION / AirEnergy SA
  • Provision of Forester services for the issuance of characterization deeds for the areas of the projects: 1. 28 MW Wind Farm at the location “KOURMOUTSI – KARDARA” 2. 25.3 MW Wind Farm at the site “PYRAMID – TURTLE” and 3. Wind Farm at position “KILLED – DEEP CORNER”. / AirEnergy SA Development – Construction of RES
  • Provision of Forester services for the issuance of a deed of characterization of the project 15 MW Wind Farm at the location “Aerorachi” of the Municipality of Amyntaio P.E. Florina of the Decentralized Administration of Epirus and Western Macedonia “. / AIR FLOOR PARK SA
  • Provision of Forester services for the issuance of a characterization act and participation in the environmental study of the project Wind Clock “CLOCK – BLACK STONE” on Mount Vermio. / ELTEX ANEMOS SA
  • Provision of Forester services for the issuance of a designation deed for the areas of the projects KASIDIARIS 1 wind farm with a capacity of 50 MW at the location “KRANIES-KARAVAMIA-ELATOS” and Kassidiaris wind farm with a capacity of 50 MW at the location “AGRACHLADIA-PR. ILIAS- PETRA HAIDOS – DIAVOLORRACHI – TOURLA – PROPHET ILIAS “. / Electricity generation company ELTEX ANEMOS SA